Syneria advises Amarenco for the acquisition of a PV plant located in Pierrefonds, Réunion Island

Posted Leave a commentPosted in Non classé

Syneria has advised Amarenco for the acquisition of a 3MWp PV plant located in Pierrefonds, Réunion Island (French overseas department). The ground mounted PV plant is located next to Pierrefonds airport and has been operational since 2010. Its operational record and historical performances were appraised by Syneria in order to assess past and future operational […]

Syneria advises BPCE Energeco and Calycé Développement for the financing of Piroy wind farm (10.4MW)

Posted Leave a commentPosted in Non classé

Syneria was delighted to advise BPCE Energeco for the financing of Piroy wind farm. The project was developed by  Calycé Développement and will be built in the Grand Est Region. The Eole de Piroy wind farm consists of 3 Siemens Gamesa SG132 3.4MW and is located in Osne-le-Val and Montreuil-sur-Thonnance. Syneria’s scope of work included […]

Syneria has supported French wind farm developer/operator Neoen during the Take-Over process of Les Hauts Chemins wind farm

Posted Leave a commentPosted in Non classé

Syneria has supported French wind farm developer/operator Neoen during the Take-Over process of Les Hauts Chemins wind farm. The project is located in les Vosges region and consists of 6 Nordex N117 2.4MW Wind Turbine Generators WTGs. Although it was commissioned in July 2019, Syneria’s involvement started back in April 2019, with the quality inspection […]